| After
all the steel is measured and cut the long members are
placed so we can begin the welding assembly, starting with
the body ribs and outer rails. |
|

|
 |
| The
body is given the final paint coat and mounted
after adding the custom pipe storage racks. This
truck will receive it’s lift gate and wooden
floor before delivery. |
 |
|
Body
gussets are added for additional support. |
The
finished side wall frames are clamped and welded. |
|

|
 |
| The
outer and inner skins are welded in place, then primed to
prepare for the final paint coat. |
 |
 |
| Custom
pipe racks are designed, fabricated and welded in to place
before the final color paint coats. |
|
|
|